SOUTHERN RAILWAY ANNOUNCES CHANGES TO TRAIN SERVICES DUE TO ENGINEERING WORKS ON CHENNAI CENTRAL-ARAKKONAM SECTION

The Southern Railway on Saturday (June 15) announced significant changes in the pattern of EMU train services on the Chennai Central – Arakkonam section to prioritize passenger safety and ensure the smooth operation of train services. As part of ongoing engineering works, a Line Block/Signal Block will be in effect at the Tiruvallur Yard from 00:20 hrs to 04:15 hrs on June 19th and 20th, 2024. As a result, the following changes will be made to the pattern of EMU train services:

Full Cancellation of EMU Train Services

  1. Train No. 43201: The Moore Market Complex – Tiruvallur EMU local, which usually departs from Moore Market Complex at 04:30 hrs, will be fully canceled on June 19th and 20th, 2024.
  2. Train No. 43202: The Tiruvallur – Moore Market Complex EMU local, scheduled for departure from Tiruvallur at an unspecified time, will also face full cancellation on the same dates.

The engineering works are essential to enhance the safety and reliability of the rail infrastructure. Passengers are advised to plan their journeys accordingly and consider alternative travel arrangements during these times.

For real-time updates and further information, passengers can check the Southern Railway’s official website or contact their helpline. The railway authorities are taking all possible steps to complete the engineering works within the stipulated time to resume normal services promptly.

2024-06-15T13:11:07Z dg43tfdfdgfd